Hilton Waldorf, London
The Practice has been appointed to undertake a variety of refurbishment and plant replacement projects on a phased basis which includes the following:
- Replacement of Boiler & HWS generating plant.
- Electrical mains upgrade.
- Lightning protection.
- Replacement of existing hot and cold water distribution mains serving bedrooms.
- Installation of displacement ventilation to the refurbished Palm Court room.
M&E Services:
The concept design of the services installation required careful integration within a listed building whilst the Hotel continued to operate.
The following services were provided:
- Displacement ventilation system within the Palm Court room.
- Replacement boilers and HWS generating plant within basement area
- Lightning protection system.
- Electrical mains upgrade
Client:
Hilton UK Hotels Ltd
Architect:
Crerar & Partners Architects